Upgrade MARK II
The objective of this work is to deliver to Keck a second red side dewar and detector electronics, tested and characterized. This work includes installation of the new dewar on LRIS at Keck. It will be plug in compatible with the existing system. To the extent required, the software will be updated to run the new LBL chips and a new software version will be delivered to Keck.
Photographs |
---|
Dewar, September 2010 |